Meter Connection Charge

Meter Connection Charge

The meter connection fee is charged to a property owner requesting a new connection to our system. This is a one-off charge and covers the cost of the installation of meter box, water meter, curb stop (shut off valve) and a back-flow prevention device.

Owners applying for a new connection need to know that the district has to apply to the Ministry of Transportation and Highways for a permit to do this work. Such an application can take up to six weeks to be approved by the Ministry.

¾” meter $1000.00
1” meter $100.00 plus cost
1 ½” meter $100.00 plus cost
2” meter $100.00 plus cost
3” meter $100.00 plus cost